Forums before death by AOL, social media and spammers... "We can't have nice things"
|    alt.engineering.electrical    |    Electrical engineering discussion forum    |    2,548 messages    |
[   << oldest   |   < older   |   list   |   newer >   |   newest >>   ]
|    Message 1,914 of 2,548    |
|    Anthony Stewart to All    |
|    Re: The rating of an EHV transmission li    |
|    29 Sep 17 09:08:02    |
      From: tony.sunnysky@gmail.com              The power rating in MVA needs to be defined according to the regional standard       at a defined atmospheric condition. e.g. 35'C and with solar heat. There will       be a rating for over current defined perhaps at 102 to 120% for normal to       emergency conditions        depending on seasonal ambient.               Thus the utilization or margin of derating of this capacity must consider the       heuristic fluctuations and mesh capacity margin of the grid for expected       variations and with provisions for isolation protection for faults and load       sustainability for nuclear        generators.              --- SoupGate-Win32 v1.05        * Origin: you cannot sedate... all the things you hate (1:229/2)    |
[   << oldest   |   < older   |   list   |   newer >   |   newest >>   ]
(c) 1994, bbs@darkrealms.ca