Forums before death by AOL, social media and spammers... "We can't have nice things"
|    alt.engineering.electrical    |    Electrical engineering discussion forum    |    2,548 messages    |
[   << oldest   |   < older   |   list   |   newer >   |   newest >>   ]
|    Message 2,071 of 2,548    |
|    J.B. Wood to All    |
|    Another MV Distribution    |
|    26 Apr 19 13:11:20    |
      From: arl_123234@hotmail.com              Hello, all, and I may have posted this question once before, which has       to do with procedure rather than a theoretical understanding: On       overhead MV distribution systems one often observes a bank of power       factor (PF) correction capacitors. I get the theory but how do       engineers decide the location for these capacitors? Is it based upon       actual measurement of MV PF at a location or an estimate by electric       utility engineers? They've got to come up with the amount of KVAR       correction required by some means. I've never seen any PF measurement       equipment designed for direct connection to MV lines (seems kind of       dangerous). Thanks for your time and comment. Sincerely,       --       J. B. Wood e-mail: arl_123234@hotmail.com              --- SoupGate-Win32 v1.05        * Origin: you cannot sedate... all the things you hate (1:229/2)    |
[   << oldest   |   < older   |   list   |   newer >   |   newest >>   ]
(c) 1994, bbs@darkrealms.ca