home bbs files messages ]

Just a sample of the Echomail archive

<< oldest | < older | list | newer > | newest >> ]

 Message 2681 
 JG to conklin 
 Re: safety improvements why not for oil  
 16 May 14 16:40:24 
 
From: jgrove24@hotmail.com

On Friday, May 16, 2014 12:19:54 PM UTC-5, conklin wrote:
>  wrote in message
>
> news:4992f897-fa17-41c7-b650-e1b6c2448af6@googlegroups.com...
>
> > http://www.mta.info/news/2014/05/15/metro-north-announces-sw
eping-series-safety-reforms
>
>
>
>
>
> Automated Track Inspection: Metro-North has developed a comprehensive
>
> automated track inspection plan. This plan includes the use of track
>
> geometry measurements, machine vision track inspection, and rail internal
>
> defect testing. These efforts will augment the visual inspections conducted
>
> by the railroad. Metro-North is purchasing an autonomous track monitoring
>
> system to be mounted on passenger rail cars, to provide continuous
>
> information about the condition of the right-of-way. The railroad will also
>
> obtain a dedicated track geometry vehicle.
>
>
>
>
>
>
>
> This is what is needed for those 120 car oil trains.  They need a sensors on
>
> every oil train.

How about a "dedicated track geometry vehicle" riding a mile ahead of the
train ?? At least one of those pickup trucks that can ride the rails and have
the driver inspect for major issues.

--- SoupGate/W32 v1.03
 * Origin: LiveWire BBS -=*=- UseNet FTN Gateway (1:2320/1)

<< oldest | < older | list | newer > | newest >> ]

(c) 1994,  bbs@darkrealms.ca