home bbs files messages ]

Just a sample of the Echomail archive

<< oldest | < older | list | newer > | newest >> ]

 Message 2685 
 Sancho Panza to conklin 
 Re: safety improvements why not for oil  
 16 May 14 21:53:30 
 
From: otterpower@xhotmail.com

On 5/16/2014 1:19 PM, conklin wrote:
>  wrote in message
> news:4992f897-fa17-41c7-b650-e1b6c2448af6@googlegroups.com...
>> http://www.mta.info/news/2014/05/15/metro-north-announces-swe
ping-series-safety-reforms
>
>
> Automated Track Inspection: Metro-North has developed a comprehensive
> automated track inspection plan. This plan includes the use of track
> geometry measurements, machine vision track inspection, and rail internal
> defect testing. These efforts will augment the visual inspections conducted
> by the railroad. Metro-North is purchasing an autonomous track monitoring
> system to be mounted on passenger rail cars, to provide continuous
> information about the condition of the right-of-way. The railroad will also
> obtain a dedicated track geometry vehicle.
>
Does that mean that Metro-North does not now have a geometry car? Maybe
it rents or borrows them.



---
This email is free from viruses and malware because avast! Antivirus
protection is active.
http://www.avast.com

--- SoupGate/W32 v1.03
 * Origin: LiveWire BBS -=*=- UseNet FTN Gateway (1:2320/1)

<< oldest | < older | list | newer > | newest >> ]

(c) 1994,  bbs@darkrealms.ca